Health Dictionary AI Health Chat Find an Online Doctor

High anion gap metabolic acidosis critical pathways

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

metabolic acidosis critical pathways
Anion gap High Normal Low
Delta-delta (ΔΔ) value Greater than 2 Between 1 and 2 Less than 1

Definition

  • Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
  • Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
    • Delta anion gap (ΔAG) = Calculated anion gap – Expected anion gap
      • Calculated anion gap = [Na+] – [Cl] – [HCO3]
      • Expected anion gap = 2.5 x serum albumin level
    • Delta bicarbonate (ΔHCO3) = 24 – serum bicarbonate level

References

Template:WikiDoc Sources

© 2026 MyEClinic – IFTM Institut für Telematik in der Medizin GmbH