Health Dictionary AI Health Chat Find an Online Doctor

Tachycardia with pulse critical pathways

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]

Critical Pathways

Tachycardia Critical Pathways
Presence of pulse? Yes No
Hemodynamically stable? Yes No

Definitions

  • Hemodynamic instability is defined as:
  • SBP <90 mm Hg or
  • MAP ↓ >30 mm Hg below baseline

Action Items

  • Maintain patent airway; assist breathing as needed.
  • Maintain IV/IO access.
  • Administer oxygen if hypoxemic.
  • Monitor blood pressure, oximetry and attach ECG monitor/defibrillator.

References

© 2026 MyEClinic – IFTM Institut für Telematik in der Medizin GmbH