High anion gap metabolic acidosis critical pathways
Introduction
Approach
Approach
Definition
Definition
- Delta-Delta value is used to determine whether there is an additional metabolic acid-base disturbance or not.
- Delta-Delta (ΔΔ) = Delta anion gap (ΔAG) / Delta bicarbonate (ΔHCO3)
- Delta anion gap (ΔAG) = Calculated anion gap – Expected anion gap
- Calculated anion gap = [Na+] – [Cl–] – [HCO3–]
- Expected anion gap = 2.5 x serum albumin level
- Delta bicarbonate (ΔHCO3) = 24 – serum bicarbonate level
References
References
Template:WikiDoc Sources
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]