Developer site: The content shown here is test data.

Health Dictionary AI Health Chat Find an Online Doctor
A serene Zen garden with raked sand and smooth stones, symbolising clarity and calm

Health Dictionary

Back to skin conditions

Metabolic acidosis critical pathways

Introduction

Critical Pathways

Critical Pathways

metabolic acidosis critical pathways
Anion gap High Normal Low
Definition

Definition

  • Metabolic acidosis is a state in which the blood pH is less than 7.35 due to increased production of H+ by the body or the inability of the body to form bicarbonate (HCO3–) in the kidney.
  • Anion gap = [Na+] – [Cl–] – [HCO3–]
  • Normal reference range for anion gap is between 8 and 16 meq/L.[1][2]
References

References

  1. ↑ Benjamin Abelow (1998). Understanding acid-base. Baltimore: Williams & Wilkins. ISBN 0-683-18272-2.
  2. ↑ Rector, Floyd C.; Brenner, Barry M. (2008). Brenner & Rector’s the kidney. Saunders Elsevier. ISBN 1-4160-3105-7.

Template:WikiDoc Sources

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]