Developer site: The content shown here is test data.

Health Dictionary AI Health Chat Find an Online Doctor
A serene Zen garden with raked sand and smooth stones, symbolising clarity and calm

Health Dictionary

Back to skin conditions

Tachycardia critical pathways

Introduction

Critical Pathways

Critical Pathways

Tachycardia Critical Pathways
Presence of pulse? Yes No
Definitions

Definitions

  • Tachycardia is defined as an arrhythmia with a rate of ≥100 beats per minute. Clinically significant tachycardia refers to an arrhythmia rate of 􏰈≥150 beats per minute.
  • Wide QRS complex is defined as a QRS complexes with a duration of ≥0.12 second.[1]
Action Items

Action Items

  • Perform a carotid pulse check.
References

References

  1. ↑ Neumar, Robert W.; Otto, Charles W.; Link, Mark S.; Kronick, Steven L.; Shuster, Michael; Callaway, Clifton W.; Kudenchuk, Peter J.; Ornato, Joseph P.; McNally, Bryan; Silvers, Scott M.; Passman, Rod S.; White, Roger D.; Hess, Erik P.; Tang, Wanchun; Davis, Daniel; Sinz, Elizabeth; Morrison, Laurie J. (2010-11-02). “Part 8: adult advanced cardiovascular life support: 2010 American Heart Association Guidelines for Cardiopulmonary Resuscitation and Emergency Cardiovascular Care”. Circulation. 122 (18 Suppl 3): –729-767. doi:10.1161/CIRCULATIONAHA.110.970988. ISSN 1524-4539. PMID 20956224.

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]