Developer site: The content shown here is test data.

Health Dictionary AI Health Chat Find an Online Doctor
A serene Zen garden with raked sand and smooth stones, symbolising clarity and calm

Health Dictionary

Back to skin conditions

Tachycardia with pulse critical pathways

Introduction

Critical Pathways

Critical Pathways

Tachycardia Critical Pathways
Presence of pulse? Yes No
Hemodynamically stable? Yes No
Definitions

Definitions

  • Hemodynamic instability is defined as:
  • SBP <90 mm Hg or
  • MAP ↓ >30 mm Hg below baseline
Action Items

Action Items

  • Maintain patent airway; assist breathing as needed.
  • Maintain IV/IO access.
  • Administer oxygen if hypoxemic.
  • Monitor blood pressure, oximetry and attach ECG monitor/defibrillator.
References

References

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]; Associate Editor(s)-in-Chief: Steven Bellm, M.D. [2]